The Hotchkiss School

Lakeville, CT

 

Overview

edm has been providing structural and MEP engineering services for various buildings at The Hotchkiss School. Projects include the Eifers Walk Study, a faculty lounge renovation and three dormitory renovations. 

Buehler Hall dormitory renovations began in 2018 and included multiple phases of construction over three different summers. The building scope included replacing the heating system, adding sprinklers and adding new finishes throughout the building. The faculty apartments were reconfigured with the addition of air conditioning. A redesign of the lobby entry space and reconfiguration of the student bathrooms were also completed.

The second dormitory renovation, Wieler Hall, was a single phase of construction. edm replaced the heating system, added sprinklers, and replaced ceilings and lighting throughout.

The third dormitory, Tinker Hall, began in 2021 and will be a multi-phase construction. Similar in scope to Buehler Hall, the project includes replacing the heating system, adding sprinklers and new finishes throughout. The faculty apartments will be reconfigured with the addition of air conditioning. A redesign of the lobby entry space, reconfiguration of the student bathrooms and addition of an accessible ramp will also be completed.

 

Services Provided

  • Code Analysis
  • Mechanical Design
  • Structural Design
  • Plumbing Design
  • Electrical Design
  • Fire Protection
  • Project Management